Categories
News

Upgrades to Fire Hydrants

You may notice some white paint on the streets of the association.  The paint may include the letters “LOC AWWD”.   This marks the location of the Alderwood Water and Wastewater line.  There also may be letters in multiple colors sprayed on the grass. These identify the location of the various untderground utilities (water, gas, power, phone, etc.)  This is all in prepartion for the replacement of some of the fire hydrants in the area.

Talking to the Alderwood Water and Wastewater crew, homeowners were told that there is nothing wrong with the existing hydrants.  However, they are twenty-five years old, and it is becoming difficult to obtain replacement parts for these units.  In order to be proactive and insure that the hydrants will work when needed, the old units are being replaced.

The process is rather quick.  It takes a few hours to replace the hydrant.  Crews return a few days later to pour a concrete pad around the new unit.

If you have more questions, please contact the Alderwood Water and Wastewater Department.

Categories
News

Damage to Sidewalk

Homeowners have contacted the association about damaged and raised areas of the sidewalks in our neigoborhood.  Concerns have been voiced about the safety posed by these areas.

The HOA has been in contact with Snohomish County regarding these issues, and the association has been assured that the repair of these areas is on their calendar.  However, the county added that there is a significant backlog of repair jobs, and that it would be some time until permanent repairs can be made.  In the meantime, the county did come out and “grind down” the concrete in the problem areas.

If you are concerned about sidewalks in our community, you are encouraged to contact the Snohomish County Department on of Public Works.  It should also be noted that, if the damage is due to a tree on your property, you may be required to remove the tree before permanent repairs can be made.

Categories
Meetings

December 2020 Board Meeting

The December 2020 meeting of the Board of Directors of Regatta Estates was held online. While the meeting was scheduled for 6:30, there was a slight delay due to a technical issue with the meeting audio, The meeting was called to order by the board president at 6:38 p.m.

Homeowner Forum: Since no homeowners chose to speak, there was no Homeowner Forum at this meeting.

Reports:

  1. Treasurer’s report: The treasurer had email all board members copies of the December treasurer’s report, a copy of the November 30, 2020 bank statement, and a copy of the budget comparison report. The treasurer had also emailed the board vice-president a scan of the current page of the checking account register and the current page of the savings account register. She confirmed that the amounts listed on the registers corresponded to the amounts listed on the report as the adjusted statement balance. As we approach the end of the year, the treasurer confirmed that we came in under budget, and, as of December 17, the association had received the same number of dues payments as we had for all of 2019.
  2. Landscaping Committee: Committee reported that the mowing of common areas has ended for 2020. Mowing is expected to resume in April of 2021. Entryway cleanup continued in November and December. Committee pleased with the current landscaping company, and would like to continue with them in the next year.
  3. Architectural Control Committee: Committee has not received any new applications in the past three months. The committee expects this to remain slow until spring.
  4. Arborist Committee: Committee had a certified arborist perform an inspection of all six of the common areas owned by the HOA. The arborist found 60 trees that he deemed hazardous. The HOA submitted the report to Snohomish County via their online application, and requested that the county confirm receipt of the application. To date, the county has not confirmed that they received the documents, nor have they contacted the committee with a time for a review of the arborist’s report.

Old Business

  1. Reminder letters: The annual HOA dues are normally to be paid by April 30th. In May or June, reminder letters are sent to those who failed to make the deadline. However, due to the unique situation that we are in this year, the board agreed to accept the January amounts through the end of the year. Reminder letters were sent to homeowners reminding them that, if they did not take advantage of this offer, the late fees and interest would be applied to the amounts, starting with the original April 30, 2020 date.
  2. Website: The webmaster announced that they were able to include a new category this year for the Architectural Controls. While not the original format, it does allow the revisions to the Architectural Controls to be published and made available to all of the homeowner. The webmaster also added directions for resetting the site should issues occur with the roll-out of the updates issued by the hosting company.
  3. Taxes: The treasurer has been monitoring the interest and has determined that this should not be an issue when calculating the 2020 federal taxes for the HOA.

New Business

  1. Refi and home sales inquiries: The board has received a large number of inquiries from escrow companies who are assisting homeowners go through the refinance process. While most companies are quite helpful, one escrow company demanded that we confirm limits on thier liability. There is nothing in our CC&Rs nor could we find anything in the RCWs on homeowner associations that mention any such limitation. The board was also harassed by a realter who insisted that the HOA create a special documents for his client. While he would not submit any samples of what he was looking for, he continued to insist that the board supply his client with these documents. Note: The board routinely completes “demand statements” that outline the homeowner status with the HOA, and any financial issues that a new homeowner should know. The board agreed that we may need to obtain an opingion from the hoa attorney.
  2. Roll-over of some 2020 dues: In compliance with the Internal Revenue Ruling 70-604, the treasurer proposed that any surplus funds from 2020 be rolled-over and applied against the expenses of 2021. The members unanimously approved the proposal.
  3. Budget: The treasurer presented the 2021 budget worksheet which included the expenses from the past four years. The members discussed each line item in the budget and reviewed the requirements for 2021. The members votged to accept the final draft of the 2021 budget, and the 2020 roll-over funds were applied. The 2021 REHOA dues will be $350.00, and the due date will be April 30, 2021.
  4. Pre-approval of Standard Expenses: REHOA bylaws require b oard approval for all expenses. In order to streamline the expense process, the treasurer proposed that the board pre-approve some common expenses, including the monthly landscaping expenses, fees for stairway and detention pond maintenance, 2020 federal tax preparation fee. website fees, the HOA insurance payments, state incorporation fee, mail box rental fee, and office expenses. The motion was passed unanimously.
  5. Proposal to update the REHOA signers: In order to maintain a form of dual control on all checks, the treasurer is not allowed to sign any checks. Other members of the board are registered with the bank as signers. The treasurer proposed the the association update the list of signers by removing former signers who are no longer on the board, and adding the board president as an alternative signer. Motions was approved unanimously by the members.

Action Items

  1. The treasurer will send out the 2021 dues letters
  2. The arborist committee wil contact Snohomish County again regarding the committee request to remove trees deemed hazardous in the 2020 arborist report.
  3. The list of signers on HOA accounts will be updated.
  4. A board member will contact the REHOA attorner for clarification on questions posed by excrow and real estate representatives.

Next meeting: February 4, 2021, at 6:30 p.m., online via Zoom.

Meeting adjourned at 8:00 p.m.

Categories
Meetings

October 2020 Board Meeting

Date: October 1, 2020

Place: Virtual Meeting, held online via Zoom

The Board president called the meeting to order at 7:00 p.m. There were no homowners president, thus there was no homeowner forum.

Reports:

Vice-president’s Report: At the July meeting, homeowner’s expressed concerns about raised sections of the sidewalk on 133rd St. S.W. The vice-president contacted Snohomish County and requested that the sidewalk be repaired. The county said that they would add this project to their list of repair jobs. Unfortunately, due to budget restraints and the number of other repair projects that have already been requested, it may be some time before permanent repairs can be made. However, the county did come out and ground down the raised areas on several of the sidewalk. Note: The last time the HOA requested a repair on a sidewalk, it was approximately four years until the job was completed.

Treasurer’s Report: The treasurer distributed copies of the August, September, and October treasurer’s reports, the corresponding bank statements, and up-to-date budget comparison report. The board looked at the dues payments and compared it to past years. While payments were dues on April 30, the board voted to send a reminder notice to delindquent homeowners. In light of the covid-19 situation, the board also agreed to accept payments through the end of the year. However, any homeowner who does not submit their dues will be assessed the late fee of $25.00 and interest starting at the original due date.

Landscape Committee: The landscaper has been mowing the common areas twice a month during the growing season. This will be cut back to once a month as we approach winter, and will be shut down entirely in the December through February months. The landscaper will continue to maintain the entryways.

Arborist Committee: In October and November of 2019, the committee requested permission from Snohomish County to remove some dead trees on Tract 994 (between Division 1 and Division 4). If these trees fall, they can reach home, pedestrians, car traffic, and the main power lines to our area. However, the county has not responded to any of our requests. Furthermore, they do not even confirm that they have received our requests. The committee has since submitted an online request to Adam Jackson for a site visit. He responded that we would need to submit another arborist report to Snohomish County PDS. Using the list on the Snohomish County website, the committee has contacted a local arborist for a new study.

Website: The website administrator was able to create a new “category” and placed it on the home page header. However, it is not as user-friendly as the original document file. Administrator asked board members to examine the new section and offer their suggestions.

Tract 992: The HOA landscaper reported that survey flags had been placed on Tract 992. This is the area below Division 1 over which the developer of the new housing division wants to run sewer lines. In order to protect the association homeowners, it is suggested that the association have a wetlands expert perform a Wetlands Verification on this tract. Once obtained, this will be presented to Alderwood Water and Wastewater for review before granting permission to developer.

Action Items:

  1. Secretary has contacted the county regarding the damaged sidewalks, and will continue to work with homeowners regarding the removal of trees that are causing issues.
  2. Landscape committee had HOA landscaper perform some maintenance on Tract 993. Landscaper will continue to maintain
  3. Arborist committee will be submitting new arborist report to County.
  4. Arborist committee will work with Touchstone Ecoservices to perform a Wetlands Verification on Tract 992.

Next Meeting: The next meeting will be held online on December 10 or 17. The date will be confirmed later and posted to the HOA website.

Meeting was adjourned at 8:15 p.m.

Categories
News

Wildlife in and Around Regatta Estates

With the abundance of green belts surrounding our homes, we have a wide variety of wildlife.  In addition to the majestic Bald Eagles and Redhawks that you might see overhead, there have also been reports of coyotes and cougars in the area.  Neighboring communities have reported that their members have lost cats and dogs to the coyotes.  It is recommended that you keep small pets indoors, especially at night.  These predators tend to do much of their hunting during  this time: from dusk to dawn.

If you witness a predator in the area, do not approach it.  Contact PAWS Wildlife Center at 425-787-2500.

Categories
Meetings

July 2020 Board Meeting

Date: July 9, 2020

Place: Due to Covid-19 restrictions, meeting was held online via Zoom

The Board President called the meeting to order at 7:00 p.m. One homeowner mentioned the raised sections of the sidewalk on 133rd St SW due to tree roots. The board secretary commented that it took the county over four years before they repaired a previous damage sidewalk. Before that repair could be completed, the owner of the trees had to remove the trees to prevent further damage. The board secretary is going to contact the county, and encouraged homeowners to also call.

Treasurer’s Report: The treasurer distributed copies of the July Treasurer’s report, the June 30 bank statement, and the budget comparison report. Board members discussed the current status of the plan of action that had been adopted at the beginning of the year. Most line items were on or below budget. A few items, such as the website, seemed to have exceeded their yearly budget. The webmaster explained that the expenses shown were actually for three years. The Board also reviewed payments for 2020 and discussed late notices and possible extensions.

Landscape Committee Report: In a cost savings mode, the committee refrained from most landscape activity during the winter months. The HOA landscaper began mowing the common areas in April, and is expected to continue this through the fall. The committee is also scheduling a cleanup of the detention pond across from Division 1, and the stairs up to the school in Division 4.

Arborist Committee Report: The committee has obtained a bid for the removal of dead trees on Tract 994. However, these trees are on a steep slope. In addition, the condition of the tree trunks may not allow an arborist to climb these trees. They may be required to bring in a bucket truck to facilitate cutting. As always, the committee is still awaiting approval from Snohomish County. Regarding another group of trees, the committee was contacted by Snohomish County PUD who requested permission to cut trees along Picnic Point Rd that might impact the power lines. The committee agreed to this request. It is hoped that this can be concluded before the winter storm season.

Website: Over the past year, the webmaster has been unable to edit the items in the Documents section of the site. In particular, the Architectural Control Committee wished to update their documents to eliminate several statements that are ambiguous or poorly worded. After several attempts, the webmaster was able to add a new category to the main page header (ACC Docs). The next steps will be to update the ACC documents and post them to this new section. At this time, it is suggested that the remaining documents be left in the Documents category since they are easier to read in the old format.

Board members: Recent complaints from Division 1 (about a boat in a driveway) and complaints concerning a homeowner selling children’s plastic toys (forts, doll houses, etc) has prompted some board members to suggest that each cul-de-sac have a representative on the board. It was agreed that additional eyes would allow the board to keep informed about the conditions in each area.

Review of Action Items:

Secretary will contact Snohomish County regarding damaged sidewalks.

Secretary will contact homeowners whose trees are infringing on the sidewalk.

Landscape committee to contact HOA landscaper regarding maintenance to Tract 993.

Arborist committee to contact arborist for full report on all HOA common areas.

Arborist committee to contact Snohomish County to obtain permission to remove hazardous trees.

Webmaster to continue to update ACC documents.

Next Meeting: Next meeting scheduled for Thursday, September 10th. This meeting will also be online.

Meeting was adjourned at 8:10 p.m.

Categories
Docs

Submitting Request Forms to Architectural Control Committee

Completed applications should be returned to the Architectural Control Committee either online to the HOA email account, or via snail-mail to the HOA mail address:

  • Mail:  Regatta Estates Homeowners Association

           PMB 1102

           11700 Mukilteo Speedway Suite 201

           Mukilteo, WA  98275

Categories
News

July Board Meeting – Online

In order to comply with current health recommentations, the next REHOA board meeting will take place online (via Zoom conferencing). It will be held at 7:00 p.m. on Thursday, July 9, 2020.

At the beginning of the meeting, there will be a Homeowner Forum when members are invited to discuss their concerns with the rest of their neighbors.

If you are interested in attending, please email your name, home address and your personal email address to the REHOA email account listed at the top of this page. You can also use the “Contact Us” link on the REHOA website homepage. Once the board has verified that you are a member of the REHOA, you will be email an invitation to the meeting.

Date: Thursday, July 9, 2020

Time: 7:00 p.m.

Categories
Docs

Architectural Control Documents

REGATTA ESTATES ARCHITECTURAL CONTROLS

Guidelines, Criteria and Procedures

Accepted on 3/9/99
Updated 8/15/18

TABLE OF CONTENTS

Preface                                                                                                                                                               1

  1. Introduction

1.1           Categories of Exterior Modifications                                                                                                     2

1.2           How to Use This Manual                                                                                                                        2

2. Pre-Approved Construction Specifications

2.1           Fences                                                                                                                                                     4

2.2.1        Fencing Specifications                                                                                                                            4

2.2           Landscaping                                                                                                                                            5

2.3           Low Level Decks                                                                                                                                      6

2.4           Spas and Hot Tubs                                                                                                                                  6

3.0           Guidelines for Other Construction                                                                                                                         7
                3.1           Major Alterations (Additional Rooms, Garages, Carports, Greenhouses,

                                Chimneys, Metal Flues, and Attic Ventilators)                                                                                      7

                3.2           Clotheslines                                                                                                                                            7

                3.3           Decks                                                                                                                                                       7

                3.4           Pet Houses/Runs/Enclosures                                                                                                                 8

                3.5           Driveways                                                                                                                                               8

                3.6           Exterior Lighting                                                                                                                                     8

                3.7           Painting                                                                                                                                                   8

                3.8           Patios                                                                                                                                                      8

                3.9           Recreation, Sports and Play Equipment                                                                                                 9

                3.10         Retaining Walls                                                                                                                                      9

                3.11         Signs                                                                                                                                                       9

                3.12         Storage Sheds                                                                                                                                         9

                3.13         Sun Control Devices                                                                                                                                9

                3.14         Swimming Pools                                                                                                                                     10

                3.15         Tree Removal                                                                                                                                         10

                3.16         Walkways                                                                                                                                               10

                3.17         Wire and Pipes                                                                                                                                       10

4.0           Prohibited Items/Construction

                4.1           Antennae                                                                                                                                                                11

                4.2           Drainage                                                                                                                                                 11

                4.3           Temporary Structures                                                                                                                             11

                4.4           Trash, Building Materials                                                                                                                       11

                4.5           Freestanding Flagpoles                                                                                                                          11

5.0           Application Procedure                                                                                                                                            12

6.0           ACC Committee Review Procedure                                                                                                                        13

7.0           Complaint Procedure/Fine System                                                                                                                        14

Appendices
                Appendix A              – Sample ACC Application
                Appendix B              – Sample Stop Work Order

                Appendix C              – Sample Complaint Form

                Appendix D              – Regatta Estates Map

PREFACE

Why did you purchase your home in Regatta Estates? There are many answers to this question – as many as there are Regatta Estates homeowners. Almost all people will have one answer in common, however. They like the look and feel of Regatta Estates.

The Regatta Estates Association, of which every homeowner is a member, was established to preserve and enhance the resources of Regatta Estates. The Association is charged with preserving open space and ensuring the preservation of the residence and landscaping design qualities, uniformity and compatibility which make Regatta Estates a desirable community in which to live.

The Covenants, Conditions & Restrictions (CCR’s) are a part of every deed to property within Regatta Estates (each property owner receives a copy at closing) and grant the Association the legal authority, to review and approve or disapprove the details and written plans and specifications showing the nature, kind, shape, height, material, colors, and location of proposed Living Units, buildings, fences, walls, or other structures, exterior additions to or changes or alterations therein, clearing or excavation of Lots or cutting of trees within Regatta Estates. This authority is vested by the Association in the Architectural Controls Committee (ACC).

The specifications and guidelines contained in this handbook are broad based and address those exterior modifications which homeowners most commonly wish to perform.

1.0 INTRODUCTION

This manual has been designed to aid you in determining what exterior modifications require ACC approval and how to apply.

1.1 Categories of Exterior Modifications

Proposed exterior modification will fall into one of three categories:

  • Pre-approved (following specifications)
  • Application Required
  • Prohibited Items/Construction

1.1.1 Pre-Approved

A large number of common exterior modifications (such as fences, some landscaping, etc.) are pre-approved and do not require submittal of an application to the ACC as long as the construction follows explicitly  the specifications provided in this manual. If the proposed construction does not follow the specifications, an application must be submitted and approval by the ACC is required prior to starting any work.

1.1.2 Application Required

All exterior modifications which are not explicitly listed as pre-approved or Prohibited require approval by the ACC prior to starting any work. The exterior modifications covered in this manual are not intended to be all encompassing.

1.1.3 Prohibited Items/Construction

Certain exterior modifications are expressly prohibited by the Association and may not be performed under any circumstances. A list may be found in Section 4.0 “Prohibited Items/Construction” in this manual.

1.2 How to Use This Manual

To use this manual effectively, first find in which category your proposed exterior modification falls by searching the table of contents for the type of modification, e.g. fences.

If your proposed modification is in the Pre-Approved category and you will follow the specifications explicitly, you may proceed without any further investigation.

If your proposed modification is listed in the Application Required category, or is not specifically covered in this manual, follow the procedures for application to the ACC in Section 5.0. If the proposed work is covered in this manual, show how your work will follow the guidelines provided.

If your proposed work is in the Pre-Approved category but you wish to deviate from the specifications, you must submit an application by following the procedures in Section 5.0.

WARNING: IT IS THE PROPERTY OWNER’S RESPONSIBILITY TO DETERMINE IF GOVERNMENT BODY APPROVAL (SNOHOMISH COUNTY, ETC.) APPROVAL IS REQUIRED. APPROVAL BY THE APPROPRIATE GOVERNMENT BODY DOES NOT RELIEVE THE PROPERTY OF THE RESPONSIBILITY TO OBTAIN ACC APPROVAL NOR DOES ACC APPROVAL RELIEVE THE PROPERTY OWNER RESPONSIBILITY TO OBTAIN GOVERNMENT BODY APPROVAL.

2.0 PRE-APPROVED CONSTRUCTION SPECIFICATIONS

Specifications provided in this section must be followed explicitly. If any deviation from these specifications is desired in your construction, you must submit an application to the ACC for approval. See Section 5.0 “Application Procedure.”

Much of the work homeowners wish to perform falls into the category of repair or replacement. If you intend to repair or replace items which were part of the original construction or were added after the original construction for which you obtained written ACC approval, AND you will repair or replace the items with IDENTICAL materials, you may do so without requesting ACC approval prior to performing the work. Examples of this may be repairing a cracked walkway with exposed aggregate, repainting your home in original colors, replacing a broken light fixture with an identical fixture, etc.

2.1 Fences

A privacy fence with drastically alter the appearance of your property and adjacent properties. For this reason, the ACC recommends that you discuss your fencing plans with your neighbors prior to construction.

If you plan to attach your fence to an existing fence on a neighboring property or if your fence will at any point be on your property line or cross the property line on an adjacent property, it is HIGHLY recommended that you obtain written approval from the affected neighbor(s) prior to starting your fence.

Fences along Picnic Point Road are constructed inside the homeowners’ property lines and are shared with the property of those homeowners and the homeowners association.

Fences which comply with the specifications contained in section 2.1.1, “Fencing Specifications,” do not require ACC approval with the following exceptions:

  • If your property is adjacent to a street either on a side (corner lot) or in the rear, you must obtain prior ACC approval for your fence.

2.1.1 Fencing Specifications

In all cases, the side of the fence which is more finished than the opposite side must be constructed with the finished side facing out (toward neighboring properties) and the framing side facing your property. This is commonly called a “Good Neighbor Fence.”

Chain link and other wire fences are not allowed except for the purposes of pet enclosures. See section 3.4. Any front yard fences other than wood shall be approved by the ACC.

Continuous solid fencing panels shall not exceed eight (8) feet center to center of posts.

The fence style must match the fence along Picnic Point Road or an original fence within the Plat of Regatta Estates. The fence may be stained with natural wood tones or left natural.

Fence heights shall be limited to six (6) feet as measured at all points along the fence line from the ground level on all side yard and back yard fences. Front yard decorative fences shall not exceed four (4) feet in height.

2.2 Landscaping

Landscaping can be effectively used to accent driveways, define space, create “soft” privacy screens, and reduce the visual impacts of fences, sheds, etc. Since landscaping is a design element, consideration should be given to relationship to the applicant’s house and adjacent houses.

Planting and maintenance of trees and shrubs may not obstruct sight lines required along roadways. Plantings must not block sun or views from neighboring properties, reduce air circulation to neighboring properties, nor encroach upon walkways or block walkway lighting. Shade patterns of larger trees and possible physical damage to other properties by encroaching plantings must be considered.

Homeowners must select plants which, upon maturity, will be of an appropriate size in height and width in order to comply with the above regulations. See Section 4.3, “Drainage,” for additional information.

2.3 Low-Level Decks

All decks must be compatible with the house in materials and color. Decks which measure more than 18’ from the ground to the deck flooring at any point around the perimeter of the deck do not require approval. All other decks require submittal of an application and prior approval by the ACC. See section 3.3.

2.4 Spas and Hot Tubs

All spas and hot tubs must be located in the rear of the property and must incorporate a locking cover or be completely enclosed by a six-foot wooden fence.

Sun control devices and privacy screens do require prior ACC approval. Please refer to Paragraph 3.13, Sun Control Devices for further requirements.

3.0 GUIDELINES FOR OTHER CONSTRUCTION

The guidelines which follow address a broad range of exterior alterations. As it is not possible to cover every type of construction, these guidelines define the principal factors which should be considered in your design such as size, location, quality of construction, materials, colors, relationship to adjacent properties and surrounding areas, etc. The individual merits of each proposed construction are always considered by the ACC. These guidelines should in no way restrict you in design of well thought-out alternatives.

Please note that there is an overall height restriction of nine feet on all added structures, including but not limited to sheds, playhouses and gazebos. The height restriction does not apply to remodeling of your home.

3.1 Major Alterations

  • Additional Rooms
  • Greenhouses
  • Attic Ventilators
  • Garages & Carports
  • Chimneys & Metal Flues

Major features of the house (such as vertical and horizontal lines, projections, trim details, gutters and downspouts, drainage, and materials to be used) must be reflected in the design of the addition. The location must not impair views or the amount of natural light and ventilation reaching adjacent properties. All alterations must be compatible with the original house and adjacent houses in style, materials and color.

Major alterations represent a substantial cost. It is recommended that a preliminary application for conceptual approval be submitted early in the planning process. The preliminary application should include as much information as practical but must include at least a site plan showing dimensions, elevations if applicable, relationship to adjacent houses, and property lines.

Attic ventilators, or other mechanical apparatus requiring penetration of the roof, shall be as small as functionally possible, shall be painted to match the roof, shall be located on the rear of the house whenever practical, and shall not extend above the top of the roof line.

3.2 Clotheslines

Clotheslines must be fold-up or retractable styles and must be completely out of sight when not in use. Permanent structures are not allowed.

3.3 Decks

Decks should be compatible in materials and color with the house and are to be located primarily in the rear of the yard. Other locations will be considered due to homeowner’s lot considerations. See Section 2.3, “Low-Level Decks.”

3.4 Pet Houses/Runs/Enclosures

Pet houses must be compatible with the homeowner’s house in color and material, and must be located where they will be visually unobtrusive and will have the least impact on neighbors for visibility, noise and smell. Generally, this means away from shared property lines.

Chain link dog runs will be considered if inside solid privacy fencing, softened by supplemental landscaping, and well screened.

Enclosures to confine pet(s) in an area less than the entire back yard must be placed in a location where minimum nuisance and inconvenience is caused to neighbors, and away from shared property lines and living areas of neighborhood residences.

Kennels and stables (as defined by the applicable government agencies) and prohibited.

3.5 Driveways

Only hard, stabilized surfaces of concrete or masonry will be considered. No other material will be approved.

Special care must be exercised if changes alter drainage patterns. Runoff must be disposed of with the boundaries of your own property.

3.6 Exterior Lighting

Lighting not part of the original structure and changes in original lighting which are not identical in style, scale and color to the original lighting must have approval.

The application should specify location of lighting on the property plat, height of light fixtures above the ground, wattage, and detailed descriptions of fixtures.

Lighting shall not be directed outside the homeowners property lines nor toward adjacent homeowners’ windows.

3.7 Painting

Any changes in exterior color for houses, fences, decks, roofs, and trim must be approved by the ACC. Colors of stains or paints must be compatible with colors of other houses in the neighborhood. Color chips (samples) must be submitted with the application along with a detailed description of where the colors are to be applied (trim, body, doors, etc.) See Section 2.0 regarding repainting in the same color.  

3.8 Patios

Patios will be located primarily in rear yards. Materials shall be brick, stone or concrete. If changes in grade or other conditions which affect drainage are anticipated, they must be indicated on the application. Mitigation of any possible adverse effects of drainage changes must be shown on the application. Approval will be denied if adjoining properties are adversely affected by changes in drainage.

3.9 Recreation, Sports and Play Equipment

Recreational play equipment should be placed in rear yards whenever possible. Consideration should be given to lot size, equipment size and design and visual screening.

Basketball backboards may be attached to the house or freestanding.

3.10 Retaining Walls

Retaining walls must make use of rock or wood in combination with appropriate landscaping. Because retaining walls maybe alter existing land-forms, the design of such walls must address drainage patterns.

3.11 Signs

All signs not addressed in the CCR’s or Community Rules and Regulations are subject to ACC approval. Refer to CCR’s Section 3.12 for signage policies.

3.12 Storage Sheds

A shed will be considered only if it blends with the house and maintains continuity of materials and color with the house. Metal sheds or buildings are not allowed. Refer to CCR’s Section 3.1. A storage shed shall be defined as any structure whose primary purpose is for storage of equipment or materials. Any structure whose primary purpose is for storage shall be reviewed as a shed and shall not be considered as a room addition as discussed in Section 3.1.

A detached shed may be located only in the rear or side yard. If the fence created an adverse visual effect from the street, the ACC may require a fence to be built to screen the shed. Materials and colors must match or be compatible with the house and fence to which the shed is attached or near. This includes siding, roofing, paint or stain, and construction details such as trim and pitch of roof.

3.13 Sun Control Devices

Awnings, arbors, trellises, etc. must be of a straightforward design without decoration such as scallops or fringes. They must also be consistent with the scale of the house to which they are attached and any adjacent fencing and must be located such that they do not adversely affect views, sunlight, or natural ventilation of adjacent properties.

3.14 Swimming Pools

All swimming pools (above ground, below ground, and prefabricated) must be located in rear yards. Alternate locations will be considered only for property with an unusual configuration or topographical features.

The pool and any mechanical equipment must be completely enclosed by a 6-foot high wood fence. Location of pool pump equipment should be away from adjacent neighbors to minimize impact of noise. Fences and gates must conform to the specifications in this document. If the fence was not built according to the specifications, application for the fence may be submitted with the pool application.

As the installation of a swimming pool is a major undertaking, an application for preliminary approval is recommended. The preliminary application should include a site plan showing dimensions of the pool, deck, fenced area, and relationship to the house, adjacent houses, and property lines.

3.15 Tree Removal

No tree over 8 inches in diameter, when measured 1 foot above the ground, may be removed without written approval of the ACC. Trees which are removed must be replaced. If the tree is being removed for disease or decay reasons, a different type of tree may be used as a replacement. Removal of trees for prevention of potential damage to property or personal safety reasons will be permitted.

3.16 Walkways

Only hard, stabilized surfaces will be considered. Gravel, flagstone and stepping stones are acceptable. Special care must be exercised if the addition of walkways will alter drainage patterns. Runoff must be disposed of within the boundaries of your own property.

3.17 Wire and Pipes

All utilities, wires and pipes except for control or monitoring housings must be underground. The installation of drain-pipe by the homeowner or contractor must be approved by the ACC.

                4.0 PROHIBITED ITEMS/CONSTRUCTION

The following are expressly prohibited in all areas of Regatta Estates.

4.1 Antennae

Shortwave radio and television antennae, satellite dishes and all similar devices are not allowed on private or rental residences in Regatta Estates. However, an antennae dish with a diameter not exceeding 24 inches may be acceptable if its location on the property is approved by the ACC.

4.2 Drainpipe

Obstructing or retarding the flow of drainage is prohibited. Alternations to houses or lots which may change existing drainage patterns onto adjacent lots is prohibited.

4.3 Temporary Structures

Temporary structures are not allowed on any lot in Regatta Estates at any time.

4.4 Trash Building Materials

Lumber, used building materials or litter of any kind may not be stored on a lot in Regatta Estates. Excess material and debris must be removed immediately after completion of any construction.

4.6 Flagpoles

Permanent freestanding flagpoles are not allowed.

5.0 APPLICATION PROCEDURE

Applications may be obtained from the Regatta Estates Homeowners Association website – https://regattaestates.com/. (A copy is also included in Appendix A). Completed applications should be returned to any ACC member by email ([email protected] ) or mailed to:

Regatta Estates Homeowners Association
PMB 1102
11700 Mukilteo Speedway Suite 201
Mukilteo, WA 98275

Please be sure to adequately describe the work you are proposing to do. If you have any questions, feel free to contact any member of the ACC directly. If your request is not clear, the ACC may deny your request pending submittal of clarifying information. Save yourself and the ACC some time – if you’re not sure, ask.

The following information must accompany your application:

Site Plan: A site plan is most easily prepared by submitting a copy of your property plat. Proposed changes/additions should be indicated, including dimensions and distances from adjacent properties and houses.

Materials and Colors: Samples of the materials (where practical), colors to be used, and an indication of the relationship to existing materials and colors must be provided. In most cases, a statement that “the proposed deck,” for example, “is to be painted to match existing house” is sufficient. If the proposed color(s) are not the same as the existing colors, color chips must be submitted for clarity.

Drawings and Photographs: A drawing of your proposed change/addition must be provided. Do not worry about any shortcomings in your drafting or artistic ability. Where applicable, submit manufacturer’s literature or photographs as well as freehand or mechanical drawings. The amount of detail must be consistent with the complexity of the proposal. Relationships of architectural features such as existing and proposed roof lines, window sizes and locations, building heights, roof slopes, etc. must be shown.

Acknowledgement of Neighbors: Your application to the ACC must include the signature of all surrounding homeowners who will be affected by the proposed construction, landscaping, etc. Your neighbor’s signature DOES NO constitute their agreement. It simply demonstrates to the ACC that you have informed them of your plans.

Third Party Comments: If a neighbor has concerns with your proposed work, they will have seven days from the date of their signature to register their concerns along with the Association. The ACC will then consider their concerns along with your application. Ultimately, however, the ACC decision will be based on the standards set forth in the CCR’s and this document.

Dates: The estimated start date and completion date of the proposed work must be included on the application. Your work must commence within six month of approval and must be complete with nine months from date of construction.

6.0 ACC COMMITTEE REVIEW PROCEDURE

The ACC meets periodically. Please check the Association website (https://regattaestates.com/) for meeting dates and times.

Your correctly completed application must be submitted to the ACC at least seven days before the meeting in which it will considered. This is to allow any third party comments to be considered along with your application.

Whether your application is approved or denied, you will receive written notification by email from [email protected] shortly after the meeting. However, work shall not commence until you have received the written notice of your application’s approval.

If a homeowner disagrees with a decision of the ACC, that decision may be appealed by sending an email to [email protected]. Resolution in a timely manner is the goal of the ACC, and such an appeal should be made to the ACC for review at their next meeting following the ACC decision.

Decisions made by the ACC in reviewing applications are not based on personal opinion or tasted. Judgement of acceptable design is based on the following criteria, which represent in more specific terms the general standards of the CCR’s:

Conformance with Covenants: All applications are reviewed to ensure that the proposed work is in conformance with the CCR’s and Architectural Controls.

Validity of Concept: The basic idea must be sound and appropriate with its surroundings

Design Compatibility: The proposed work must be compatible with the architectural characteristics of the applicant’s house, adjoining houses and the neighborhood setting. Compatibility is defined in terms of architectural style, use of materials, colors, and construction details.

Workmanship: The quality of work must be equal to or better than that of the homeowner’s property and the surrounding area.

7.0 COMPLAINT PROCEDURE/FINE SYSTEM

The following procedure has been established for handing Association members’ complaints regarding violations of the Architectural Controls. Complaints may be registered to the ACC. Those homeowners who wish to be contacted regarding the handling of their complaint may give their name and phone number. HOMEOWNERS ARE ENCOURAGED TO RESOLVE MATTERS AMONG THEMSELVES WHENEVER POSSIBLE.

Complaints tend to fall into one of the following categories:

  1. LACK OF ACTION – e.g. yards/landscaping not started, completed, or maintained. Woodpiles in inappropriate locations, etc.
  2. PROJECTS IN PROGRESS – without ACC approval or which deviate from submitted, approved plan; or which raise a neighborhood concern due to problems not originally considered, e.g. property infringement, quality of work, etc.
  3. COMPLETED PROJECTS – not approved by the ACC or which deviate from the submitted, approved plan. Complaints may also arise due to misuse, problems not originally considered, property infringement, quality of work, lack of County approval/permits, tree removal, etc.

Complaints will be logged, and the ACC will appoint one member to review complaints on a biweekly basis. (This appointment may be rotated on a monthly basis, or other schedule as agreed upon by the ACC). This member will review any plans on file, make a visual inspection of the site, notify the subject homeowner, and collect any other relevant data.

Should the member handling the complaint initially find that it is unfounded (not a violation of Architectural Controls), the ACC will review at their next meeting and, if there is agreement that no violation exists, the complaint will be closed, with notification to the complainant, if requested.

If a violation has occurred, the ACC member will proceed as follows for each category of complaint:

  1. LACK OF ACTION – contact homeowner, explain the Architectural Control which has been violated, request compliance, make note of the action taken on the complaint form, return the form to the Association office, report to the complainant, if requested, and report to the ACC at their next meeting.
  2. PROJECTS IN PROGRESS – contact the homeowner and explain the violation or problem, hand-deliver a STOP WORK ORDER (Appendix B) if appropriate, request a specific action by the homeowner (see possible actions below) by date of the next ACC meeting, report to the complainant, if requested, and report to the ACC at the next meeting, presenting a copy of the Stop Work Order and other relevant documentation. The ACC will then determine any further action.
  3. COMPLETED PROJECTS – with the exception of the Stop Work Order, this type of complaint will be handled as with Project in Progress.

Actions may be requested of the homeowner include, but are not limited to: 1) submission of application and plans for ACC approval; 2) submission of modifications to plans; 3) steps to mitigate concerns or problems; 4) resolution by agreement among neighbors involved; 5) removal of unapproved project.

It is in the best interest of all parties involved to review, discuss, and recommend possible resolutions. If the subject homeowner has not made a good faith effort to resolve the complaint by the subsequent ACC meeting, the ACC will then provide a written time schedule for homeowners’ resolution of the problem. An ACC member will be assigned to follow up on the complaint to see that appropriate action has been taken. The complaint will remain on the ACC agenda until it is resolved.

If a homeowner disagrees with a decision of the ACC, that decision may be appealed to the Association Board of Directors by written request to the Board. Resolution in a timely manner is the goal of the ACC, and such an appeal should be made to the Board for review at their next meeting following the ACC decision.

If a homeowner refuses to take steps to correct a violation after adequate time to do so has elapsed, the ACC will send a letter by certified mail to the homeowner outlining the violation and requesting immediate compliance.

If the homeowner still does not comply within fourteen days after receiving the certified letter, the ACC shall impose an arbitrator on the homeowner. Refer to the CCR’s Article VI, Enforcement.

Categories
Meetings

May 2020 Board Meeting

Date: May 7, 2020

Location: Online (via Zoom)

The meeting was called to order by the board president at 7:00 p.m. The president then shared his screen displaying the meeting agenda. The agenda was reviewed and approved by the members. The minutes from the January budget meeting had been sent out by the board vice-president. These were also reviewed and approved as written.

Member Forum: No homeowners asked to speak.

Reports

  1. Treasurer’s Report: The treasurer distributed copies of the May treasurers report, the April, 2020 bank statement, and the budget comparison. The president and vice president confirmed that the balances in the report were the same as those posted on the registers. The treasurer pointed reported that the 2020 dues letters had gone out on January 20th, and that payments have already been received from a majority of the homeowners. This number is consistent with the total number HOA had received by this time in previous years. This number includes a payment in full (including late fees and interest) from a homeowner who owed for a previous year. The board recognizes that some homeowners are facing tough times due to the pandemic, and discussed changes to the late fees and interest on the 2020 REHOA dues. The board will research what options are available to them based on the REHOA CC&Rs and Bylaws. In light of the statewide shutdown of businesses, it was agreed that it will be hard to find businesses to perform some of the repairs and maintenance for the HOA. As a result, we may not be able to complete all tasks this year, and some may need to be rolled over to 2021. The treasurer shared scans of the check register and the savings book register, and the board confirmed that the balances were the same as the adjusted balance from the May Treasurer’s report.
  2. Landscaping Committee– The HOA landscaper has started mowing the HOA common areas, and has performed an initial cleanup of the entryways and of the stairs in Division 4. The committee is going to direct the landscaper to cut back the blackberries in the common areas and along Picnic Point Rd. The landscaper also applied Caseron to impair the spread of weeds in the common areas. The committee is also going to have the detention pond area cleaned up.
  3. Architectural Control Committee – One homeowner applied for permission to paint their home. A second homeowner asked for information on the replacement of their fence bordering Picnic Point Rd. Many projects are being held up due to the shutdown. The ACC expects additional requests once the stay-in-place orders are relaxed.
  4. Arborists Committee – Committee is still attempting to obtain permission from the county to remove the dead trees on Tract 994 (between Division 1 and Division 4). The committee expressed some concern about the lack of response from the county. Normally, they would expect at least an acknowledgment from the county that they had received our request. However, the county has fail to even respond. On a separate tree issue, two board members met with Korien Cook of the PUD to assess the HOA trees that could impact the power lines running down Picnic Point Rd. Ms. Cook marked several trees and will request permission for the PUD Line Clearance team to remove these. No timetable on when this might occur.
  5. Secretary Report – noting new to report at this time

New Business

  1. 2019 Federal Taxes – Board members met with our representative at Block Advisors on February 11 and file the tax report for last year. The HOA does not owe any additional taxes for 2019. Treasurer will confirm that taxes can be paid directly from the HOA accounts.
  2. 2020 Audit – Last year, the REHOA completed an audit of 2015, 2016, 2017, and 2018. The board elected to cover the four years since previous boards had elected to postpone the audit for several years. The 2020 audit will cover the finances for 2019. Our auditor has suggest that this be done in July. However, this suggestion was made before the shutdown. This date may need to be adjusted due to the changes in the due date for federal taxes.
  3. REHOA Website – Webmaster contacted Go Daddy and renewed the .com domain, our private domain registration, and the website (all for three years.) In addition, our email service is now being directed through Outlook. No changes is the website at this time. Webmaster is looking to either modify the site or go to a new platform However, the initial cost estimate to have someone create a new website is expensive. The board will continue to examine options here.

Action Items

  1. Treasurer will meet with one of the signers (for the HOA accounts) to adjust the amounts in savings. However, this will have to wait until the bank reopens.
  2. Treasurer will also contact our tax accountant regarding payments on future taxes.
  3. President will try to visit BECU to complete paperwork to get him added as a signer.
  4. All board members will continue to work on consolidation and rewriting the fence policy.

Next Meeting

  1. Planned as a Zoom meeting for July 9, 2020.

Adjourned

  1. Meeting adjourned at 7:41 p.m.